Usually not directly. The subsidy is granted in the property owner's name, so the owner must apply and give written permission. If the electricity connection is in your name and the owner agrees, it can be arranged — but the application is still theirs.

About 30 to 45 days. DISCOM approval takes 7 to 15 days, installation takes one to two weeks, and the subsidy reaches your bank account by direct transfer within two to six weeks after that.

Yes, it can. If your system generates as much as or more than you consume each month, net metering can bring the bill to zero. You will still pay any fixed charges your DISCOM levies.

Good panels last 25 to 30 years. The performance warranty is typically 25 years, and maintenance is minimal — mostly keeping the panels clean.

Not with a standard grid-tied system. It shuts down during an outage for the safety of line workers. If you need backup power, you need a hybrid or off-grid system with batteries, which costs more.

Start from your monthly electricity consumption in units, which is on your bill. Our free assessment sizes the system from your bill and the usable area on your roof, and shows you both limits.

Yes. Several states and union territories add their own subsidy on top of the central one. Our assessment applies whichever additional subsidy your state offers automatically.

Using SolarSight

Yes. You see your full result — system size, cost, subsidy, savings and payback — before we ask for any contact details.

Only to send you the report and, if you want it, to connect you with installers in your area. You choose whether we may contact you about anything else.

It is an indicative assessment built on satellite irradiance data, your state's published tariff, and standard engineering assumptions. A site visit will refine it. Every assumption we use is stated in the report.